Our Work
Our Approach
Technical Expertise, Organization, Communication and Safety are our instruments for leadership.
NBC Technologies Inc. has a clear set of objectives and standards including an Ethics Policy, Reporting Documentation and Performance Objectives.
We supply quality:
- Project Management
- In-House Engineering
- Well-site Supervision
- Professional Documentation/Well-site Reporting for every assignment
... a "Total Project Commitment"
Our Experience:
Our personnel have been part of planning and project management, domestically and internationally for the following:
- Exploitation - have initiated and supported the development of exploitation strategies with several clients. Instrumental in the acceleration of land acquisition and development, and have affected positive changes in oil & gas marketing strategies. Performed drive determination, production forecasting and economic analysis.
- Design of special projects - multi-lateral, SAGD, under-balanced, horizontal, ultra high BHP and BHT wells and well control operations;
- Regulation Approved Drilling & Completion Plans and Emergency Response Plans for Critical Sour Wells
- Complete Project Management, Mobilization/Demobilization - international projects have been planned, equipment procured/expedited and supervised both from Canada and abroad, utilizing Canadian technology/services and local services;
- Land & Construction Supervision - compliant with current regulation, scout, survey, acquire, construct and reclaim drilling locations on both agricultural and forested lands.
- Drilling, Completion & Work-over of over 4000 vertical & directional wells and 200 Critical & Non-Critical Sour wells;
- Drilling, currently between 600 to 800 wells per year during the past 3 years;
- Drilling of several wells over 5000 metres;
- Drilling & Completion of over 30 wells to 4000 metres;
- Drilling & Completion of several hundred horizontal new drill wells since 1987;
- Drilling & Completion of the first medium radius horizontal well in North America in 1987;
- Drilling & Completion of over 100 Under-balanced Horizontal wells and over 175 Horizontal Re-entries;
- Drilling & Completion of 9 Horizontal Gas Storage wells (8 under-balanced);
- Drilling & Completion of over 100 vertical & horizontal Heavy Oil wells;
- Drilling & Completion of 10 Horizontal Multi-Lateral wells;
- Drilling & Completion of 2 Horizontal Under-balanced Re-entries from 114.3mm (41/2) casing;
- Coiled Tubing Drilling of several Horizontal Under-balanced Re-entries, including 3 build sections and over 20 lateral sections, and
- Drilling of numerous well re-entries to increased depth using Coiled Tubing.
View our Interactive Map to see our extensive experience on a domestic and international level.
For more information please Contact Us!